What the scheme pays
| System size | Subsidy | Note |
|---|---|---|
| Up to 1 kW | ₹30,000 | 60% of benchmark cost for the first 2 kW |
| 2 kW | ₹60,000 | Residential connections only |
| 3 kW and above | ₹78,000 | Capped — no additional central CFA beyond 3 kW |
Targets 1 crore installations by FY 2027 with an outlay of ₹75,000 crore. Eligibility is generally 1–10 kW per household, through an MNRE-empanelled vendor using ALMM-listed modules. Battery storage is not covered.
Where it helps — and where it does not
Benefits
- Direct subsidy up to ₹78,000 reduces upfront cost substantially
- Free electricity for the first 300 units a month for typical homes — delivered through generation, not a waiver
- Net metering values each exported unit at the applicable tariff
- Bank loans at about 7–9% make the net cost payable by EMI
- A 3 kW system avoids roughly four tonnes of CO₂ a year
Limitations
- Residential only — commercial and industrial connections are excluded
- Installation must be through an MNRE-empanelled vendor
- ALMM-listed modules are mandatory
- Battery storage is not covered
- DISCOM feasibility and subsidy timelines vary by state
- One claim per electricity connection, with ownership proof or NOC